Project Scope:
|
Engineering design, procurement of material, fabrication, assembly, testing, painting, packing and supply of three (3) complete manifolds in accordance with client's technical specification. The supplied Automated Manifold included piping, fittings, flanges, mating flanges, gaskets, insulating sets, stud bolts, nuts, valves, check valves, SVs, PDT, PDI, HS, I/P, HIC, ZSs, ZIs, SVs, Tis, TWs, PSHs, PSLs, PALs, PAHs, etc. including all skid mounted and remote panel mounted instruments and all required S.S. tubing/fittings, S.S. Instrument Valves, tubing trays, I.A. Lines and I.A. header, cables, wires, junction boxes, etc.
|